Dry-in

 

return to main photo album catalog

Dry-In BBQ; Brick work begins

Photos from April 21, 2006

 

On this day we had two special events.  This gathering in the area that will be the TACC computer room is a scaffolding safety briefing for the work crews. 

 

Here a demonstration is given on proper procedures for installing and inspecting the scaffolding (in both English and Spanish). 

 

Afterwards, the whole crew is treated to a Salt Lick BBQ-catered lunch (total pigfest) to celebrate the imminent "dry-in", when the interior is secured from the elements.  This is the first use of the new seminar room!

 

What's this about "dry-in"????  Here's photo of my office area - I bet you didn't know I ordered a swimming pool, eh? - one of the perks of being on the building committee.  Obviously "dry-in" is still a few days off - until the last of the Densglass (the yellow exterior wall material) and windows are installed.  Yesterday we had intense storms (golf-ball sized hail at my house) and the rainwater flowed freely into the interior of the building at numerous locations. 

 

Outside, the windows are nearly completely installed on the first floor.  Note the scaffolding on the second and third floors above the extension - this side will get it's Densglass and windows soon, now that the scaffolding safety briefing is finished.

 

On the west extension, raisable platforms are set up for the brickwork.

 

Bricks!!! - and lots of them. This photo shows the very first bricks to be laid (lower left - I didn't even realize this until I looked at the photo I took).

 

On the second floor, the water heaters and water softener are installed next to the air handler in the machine room.

 

This photo shows the director's suite taking shape on the second floor - this is the entryway.

 

Offices begin to get framed in on the south wall of the second floor.

 

View of the connector from the third floor - the window framing is beginning to take shape.

 

Next photo album

 

About UTIG Mission Statement Director's Letter Strategic Plan Directions to UTIG History Academic Partners
Overview TXESS Revolution IPY Learning Activites Wired Antarctica GK-12 Program Adopt-A-School Teachers in the Field Earthquake Hazards
Support UTIG Industry Sponsors Sponsored Projects
News Main Seminars In The News Spotlights News Releases Contacts Experts Guide Field Work Calendar JSG Meetings
Directory Research Staff Technical Staff Administrative Staff Students Alumni Standing Committees Job Opportunities
Research Main Active Projects Archived Projects Plate Models Neotectonics Plate Boundary Processes Earthquake Seismology Continental Margins Climate Polar Studies Ice and Ice-covered Lithosphere Sea-Level Fluctuations Gas Hydrate Studies Natural Resource Exploration Quantitive Geophysics Planetary Geophysics
Overview Technical Support Seismic Data Center Library OBS Facilities TexSeis Earthquake Center Hockley Seismic Station Contribution Search