January 2, 2007 --- We're there! Check out the dedication ceremony
Photo Chronicle of the UTIG/TACC building during construction
The new UTIG/TACC building (known as the Research Office Complex or "ROC") on the Pickle Research Campus is
complete (see photos of the ground breaking
ceremony)! Construction began in October of 2005. UTIG was up and running in the ROC on January 2, 2007.
John Goff and
Cliff Frohlich are UTIG's
representatives on the Building Committee overseeing the project for UT.
John will be taking photos throughout the construction process and posting them here
periodically.
Latest News:
Last inspection; substantial
completion (10/10/06)
Past photo blogs:
Ground work (11/21/05)
Steel mill field trip
(11/21/05)
Foundation work before the
concrete (12/16/05)
Before the steel
(1/3/05)
Steel arrives!
(1/9/06)
Frame rising
(1/18/06)
First slab; tower framing
completed (1/31/06)
Frame complete; visit to the 2nd
floor (2/6/06)
Details, Details
(2/14/06)
Start of interior work;
mock-up inspection (2/21/06)
Tree
topping-out ceremony (2/28/06)
Start of exterior walls (3/7/06)
Progress on interior and
exterior (3/21/06)
Moving the air
handlers (4/3/06)
Windows getting
installed (04/12/06)
A wet "dry-in"
celebration and start of brickwork (4/21/06)
First in-wall
inspection (5/3/06)
Inspection of
second floor rooms (5/16/06)
John's tour of air conditioning system
(5/23/06)
First inspection of
third floor rooms (6/6/06)
Preliminary inspection of mock-up room;
lots of interior work (6/27/06)
Progress on elevator, interior; finishing
touches on exterior (7/18/06)
LOTS of progress on the
interior finishings (9/6/06)
Pre-final inspection of
the 2nd and 3rd floors (9/20/06)
|